Roads & Transport

Geelong Road Safety Barriers

Geelong Road Safety Barriers
PROJECT OVERVIEW

Installation of road safety barriers and supporting infrastructure across Melbourne's road network, with extensive underground service investigations informing safe construction and design modifications.

Scope

Keystone Civil was engaged by the Department of Transport and Planning (DTP) to deliver road safety barrier works across median and shoulder sections as part of the Geelong Road Safety Barrier Project.

A major component of the project involved extensive underground service investigations, including service locating, scanning and Non-Destructive Digging (NDD) to identify and verify existing infrastructure ahead of construction. The high density and location of underground services presented significant constraints, requiring sections of the proposed works to be redesigned or removed from the project scope to avoid conflicts with existing assets.

Following service investigations and design modifications, Keystone undertook excavation, ground preparation and construction of concrete ground beams within road medians and shoulders, followed by guardrail installation in accordance with the approved design.

Working within a live road environment, the team coordinated construction around existing traffic movements, underground infrastructure and strict safety requirements, with a strong emphasis on protecting critical services and preventing service strikes.

Project Delivery

Underground service identification and protection were central to the project's delivery. Keystone adopted a proactive approach to service locating and verification, undertaking detailed investigations ahead of excavation to identify potential conflicts and inform safe construction methodologies.

Where existing services conflicted with the proposed barrier alignments, Keystone worked collaboratively with project stakeholders to support design reviews, scope adjustments and revised construction approaches. This early identification of constraints helped minimise the risk of service strikes, avoid unnecessary excavation and reduce potential damage to existing infrastructure.

Works were carefully staged across median and shoulder areas, supported by controlled work zones and comprehensive traffic management measures. Through thorough service investigations, adaptable construction sequencing and a strong focus on risk management, Keystone delivered the works while prioritising the protection of underground assets and the safety of road users and construction personnel.

‍

PROJECT SUMMARY

Built on experience. Ready for what’s next.

Delivering road safety barrier infrastructure through ground preparation, concrete ground beams and guardrail installation, with carefully coordinated live traffic management.

Overview

Client

DTP

Completed

2025

Underground Service Protection

Service scanning and Non-Destructive Digging were undertaken before excavation to identify underground assets, reduce construction risks and meet Department of Transport and Planning requirements.

‍

‍

Live Traffic Management

Dedicated construction and traffic management teams coordinated median and shoulder works to maintain safe road conditions, minimise disruption and support efficient barrier installation.

‍

‍

PROJECTS
Keystone Civil project site photo
Water & Wastewater Infrastructure
Landfills & Environmental

Highton Basin Cover & Liner Replacement

Highton Basin Cover & Liner Replacement

Keystone Civil project site photo
Roads & Transport
Water & Wastewater Infrastructure
Civil Infrastructure

APCO Mount Duneed

APCO Mount Duneed

Keystone Civil project site photo
Civil Infrastructure
Roads & Transport

Lower Retaining Wall Works, Great Ocean Road

Lower Retaining Wall Works, Great Ocean Road