PROJECT OVERVIEW

Construction of a right-turning lane from Beach Road into Volpini Court to satisfy town planning conditions for the Armoured Vehicle Centre of Excellence.

Scope

The works involved the construction of a right-turning lane from Beach Road into Volpini Court in Avalon, Victoria. The project aimed to satisfy town planning conditions and obtain all relevant authority approvals while integrating seamlessly with the existing road infrastructure. The project commenced with detailed design development, where construction plans were refined and finalised in consultation with stakeholders. All necessary approvals were secured to ensure full regulatory compliance. Prior to construction, service proofing was undertaken to identify and protect existing underground services.

Traffic management was critical to the project's success. A comprehensive plan, including stop/go controls, was implemented to maintain one lane of traffic throughout construction and minimise disruption to road users. Earthworks were then carried out to prepare and stabilise the subgrade for the new turning lane. Pavement construction included placement and compaction of a Type A capping layer, installation of Class 3 Cement-Treated Crushed Rock (CTCR) at 3% cement content, followed by an asphalt wearing course to complete the road surface.

Additional scope included drainage modifications, removal and reinstatement of guardrails, new kerb construction, and line marking, ensuring a durable and compliant upgrade to local road infrastructure.

‍

‍

PROJECT SUMMARY

Built on experience. Ready for what’s next.

This project demonstrates our proficiency in constructing essential road infrastructure, including the development of a right-turning lane, drainage modifications, and traffic management. By optimising traffic flow and ensuring minimal disruption, we delivered a sustainable and efficient solution that enhances safety and connectivity for road users.

Overview

Client

Hanwha Defence

Completed

2024

Sustainable Material Reuse

Existing profiled asphalt was reused to construct verges, reducing new material demand and waste generation.

‍

Minimal Disruption

Completing the works in a single stage reduced the construction timeline while maintaining traffic access and safety requirements.

PROJECTS
Keystone Civil project site photo
Water & Wastewater Infrastructure
Civil Infrastructure

Werribee Zoo Expansion

Werribee Zoo Expansion

Keystone Civil project site photo
Water & Wastewater Infrastructure

Wurdee Buloc Inlet Channel

Wurdee Buloc Inlet Channel

Keystone Civil project site photo
Water & Wastewater Infrastructure
Landfills & Environmental

Highton Basin Cover & Liner Replacement

Highton Basin Cover & Liner Replacement