PROJECT OVERVIEW

Renewal of a 1km section of the Wurdee Buloc Inlet Channel.

Scope

In September 2018, Keystone Civil was awarded the contract by Barwon Water to renew a 1km section of the Wurdee Buloc Inlet Channel. The project incorporated design and construction innovations to enhance long-term asset performance and improve site access.

Key works included the demolition of the existing concrete channel and structures, including a culvert bridge, and construction of new embankments for access and egress. Keystone upgraded the existing crest access track and undertook embankment repairs at multiple locations.

Drainage improvements were a major focus, including surface drains to control runoff and reduce rainfall ingress into the embankment. A channel underdrain was installed below the pipeline to manage dam overflow and runoff across the alignment. Longitudinal trench drainage and finger drains were also incorporated to monitor pipe integrity during operations. The new 1600mm GRP pipeline was supplied, installed, and commissioned over the 1km alignment, with new concrete structures at each end connecting to existing siphon pipes and incorporating level sensors. Four access chambers were constructed along the route, and 1km of improved access track was delivered for safer maintenance.

Project Delivery

The project incorporated environmentally sensitive landscaping and design improvements for drainage, monitoring and long-term access. Demolished concrete structures were recycled and repurposed for beneficial reuse in the new access road, reducing construction waste and the need for virgin materials.

A custom GRP pipe saw combined cutting and chamfering into one operation, reducing a typical two-person, two-hour process to approximately 15 minutes for one operator.

‍

‍

PROJECT SUMMARY

Built on experience. Ready for what’s next.

This project demonstrates Keystone Civil's capability in design & construct / water & sewer, combining practical construction methodology with coordinated delivery across technically demanding site conditions.
Wurdee Buloc Inlet Channel
Civil Contractors Federation - Earth Award Finalist

Overview

Client

Barwon Water

Completed

2019

GRP Cutting Innovation

A custom saw combined GRP pipe cutting and chamfering, reducing resources and dramatically shortening preparation time foreach pipe section.

Long-Term Asset Access

Improved drainage, monitoring points and a1km access track were integrated to support safer maintenance and long-termchannel resilience.

PROJECTS
Keystone Civil project site photo
Civil Infrastructure
Bulk Earthworks

Waurn Ponds Stabling Yards

Waurn Ponds Stabling Yards

Keystone Civil project site photo
Water & Wastewater Infrastructure

Ocean Grove Sewer Rising Main Renewal

Ocean Grove Sewer Rising Main Renewal

Keystone Civil project site photo
Roads & Transport

Pavement Rehabilitation of Birregurra-Forrest Road

Pavement Rehabilitation of Birregurra-Forrest Road